This blog is solely about the start-to-finish construction of a house.
It is recommended to start at the earliest post and proceed chronologically.


❰❰ back to LHW:A main website

January 28, 2015

Tile Work Begins

Sloped Grout Bed in the Shower
The tile guys started today. 

Sloped grout beds in the showers to form the substrate for the floor tile.  Each slopes to a slot drain at one end.

Also, the cement backer board went up around the bath tub.  We have a small wiggle in the flange of the tub for which we need to compensate.  Hopefully no one will notice the slight corrections out of plumb.

Tub Surround
Master Bath Shower

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.