We have a Fascia! 
(the boards that define the edge of the roof)


Fascia on the front overhang.  Roofing underlayment above.  Those vertical 2X4s are temporary
Fascia on roof, with Carport/entry canopy below


Painted Doors (in progress)
Interior framing added.  Framing in front of the concrete under the windows creates a wide sill, and a place for insulation.


Breakfast Nook, cantilevers out from the house a bit.

Breakfast nook on the interior creates a box that projects into the room.

Another view of the breakfast nook. 