May 27, 2015
Swedish Closet
Yes, we have Ikea in the house.
Here are the wardrobes in the newly carpeted closet. Starting to feel almost inhabitable.
Here Lisa goes into production mode on the drawer assembly.
Here are the wardrobes in the newly carpeted closet. Starting to feel almost inhabitable.
Here Lisa goes into production mode on the drawer assembly.
Carpet Diem
Carpeting is now installed!
We used a meter square carpet tile by Milliken, called Linen.
Installation was almost entirely by Lisa, whose knees are a-feelin' it now. I followed behind with baseboard trim (not shown).
May 25, 2015
Stair Handrail
The steel part of the handrail that I have been fabricating is now in place on the wall.
Next, a wood cap, and some touch-up paint completes the installation.
Next, a wood cap, and some touch-up paint completes the installation.
Butcher Block
This is my version of a butcher block under construction.
What you are viewing is a whole lot of end grain fir being glued down to a plywood substrate. The buckets and random chunks of concrete are to press them into place while the adhesive dries.
Then...hours of sanding, and an edge strip.
What you are viewing is a whole lot of end grain fir being glued down to a plywood substrate. The buckets and random chunks of concrete are to press them into place while the adhesive dries.
Then...hours of sanding, and an edge strip.
May 22, 2015
Guest Bath Progress
The toilet / tub room is complete. Well, except for the toilet paper roll holder and shower curtain.
This was the interior door that was delivered with broken glass. Got the replacement, and got it painted and installed finally.
Drilled the tile (scary) and mounted the shower bar.
May 19, 2015
Window Trim
Corner trim in progress. One panel and receiver added on the right side. Insulation shown beside it. On the left side the nailer has been added over the waterproofing.. |
A series of aluminum extrusions are fit together so that the various window are joined together visually.
Paving Progress
Finally starting the concrete flatwork (steps, walkways, driveway). You can see the wood forms on the ground where the walkway will be poured.
The subcontractor was scheduled for 2 1/2 months ago, but only now has arrived, despite constant attempts on our part to get them here. A source of major stress and consternation.
The subcontractor was scheduled for 2 1/2 months ago, but only now has arrived, despite constant attempts on our part to get them here. A source of major stress and consternation.
Lisa and the cat inspect the formwork. |
May 15, 2015
Master Bath Shower
It took a real good bit of fussing, plus some extra adapters from both the manufacturer and the hardware store, but we got our British shower fixture to work.
May 11, 2015
Front Door Landing Spot
Installed the steel box that serves as our "landing spot" by the front door - a place to drop your keys, sunglasses, etc.