|
It is a bit difficult to sit in |
Plumbing rough-in continues at a good pace. One of the more visual aspects of this is the new tub!
We are quite pleased with this tub. I would specify this again, no problem. Opening the box elicited oohs & ahs - a nice deep soaker.
Here is a link to the item.
The tub is rocked up on its side so that the drain & overflow assembly can be installed first. Also, a grout bed will go down to give good solid support to the bottom.
Then we get to see how well the framing wall & ledger I built will fit.
Also visible in this picture is beefy blocking, low & high, to support our wall mounted vertical radiator. You can see the feeds poking through from the floor.