Stem Walls
Formwork is almost complete; calling for the city inspection tomorrow.
Pouring the concrete on Friday.
I'll sure sleep better if the plumber shows up today and gets his sleeves in the stemwalls so that our sewer pipes can actually leave the building.
Had to go a second round with the electrical boxes. I put them in using products the electrical supply house told me to use. My electrician showed up and said "try again".
Apparently I had a couple fittings that were not rated for casting into concrete. These are correct now (I hope).