Steps In The Right Direction

Last week was all about steps.

Exterior concrete steps in the front, and interior wood stairs to the second floor.

June 04, 2015

Breakfast Ready

Completed Breakfast Nook seating and table.

May 31, 2015

Front Steps Underway

Formwork for the concrete front steps and walkway is underway.  Hope to complete and pour these soon.

Another Rejuvinated Light Fixture

Another old light fixture with a new life ahead. 

This one goes above the Dining Room table, if all goes well.

Butcher Block Fail

Not so smooth anymore. 
In the spirit of full disclosure, let me present my latest dose of humble pie. 

May 28, 2015

Concrete Progress


Today we finally poured some of the concrete paving "flatwork". 

May 27, 2015

Countertops!

Our countertops went in today, marking a milestone of completeness.

Butcher Block

Here is the end-grain fir butcher block in progress.

Soooo much sanding.  The endgrain is tough, and it takes hours to wear it down just a little. 

Zone out with headphones on and sand, sand, sand.

It Finally Happened

Ew.

Swedish Closet

Yes, we have Ikea in the house.

Here are the wardrobes in the newly carpeted closet.  Starting to feel almost inhabitable.

Here Lisa goes into production mode on the drawer assembly.


Carpet Diem


Carpeting is now installed!

We used a meter square carpet tile by Milliken, called Linen

Installation was almost entirely by Lisa, whose knees are a-feelin' it now.  I followed behind with baseboard trim (not shown).


May 25, 2015

Stair Handrail

The steel part of the handrail that I have been fabricating is now in place on the wall.